Guide / Whitepaper United States European Union Canada International Regulatory Quality Manufacturing & Supply Chain IVD

Playbook · Supplier management · 18 min read

How to Create and Maintain an Approved Supplier List (ASL)

Most device and IVD companies keep one, and many of them are a spreadsheet nobody fully trusts. This playbook walks through building an approved supplier list that answers the questions auditors actually ask (approved for what, at which site, on what evidence, and until when) and then keeping it true as suppliers, parts and risks change.

One line on the list should answer five questions

WhoLegal entity
WhereManufacturing site
For whatParts, processes or services
How riskyRisk class
Until whenStatus and next review

What an ASL is, and what it isn't

An approved supplier list (also called an approved vendor list, AVL, or approved supplier register) is the controlled record of which suppliers your company may buy from, and for what. Purchasing uses it to place orders, receiving uses it to check deliveries, and quality uses it to plan audits and re-evaluations.

No regulation calls it an "ASL". ISO 13485, which FDA's Quality Management System Regulation (QMSR) now incorporates by reference, requires you to set criteria for evaluating and selecting suppliers, plan their monitoring and re-evaluation, and keep records of all of it.[1][2] The Global Harmonization Task Force guidance on supplier controls gives adding a supplier to a documented approved suppliers list as one way to record the acceptance decision.[11] So the list is a convention, but the decisions it records are required.

It is

  • An index of current approval decisions, each with a scope, a site, a status and a date
  • The gate purchasing checks before a purchase order goes out
  • A driver for re-evaluations, audits and certificate renewals

It isn't

  • The evidence itself. That lives in the supplier file: evaluations, audit reports, agreements, monitoring data
  • A list of every company that has ever invoiced you
  • A one-time project. A list that isn't maintained is a liability in an audit

What the requirements actually say

The same handful of ISO 13485 clauses drive supplier control in the US, the EU, Canada and most other markets. In plain language:[1]

ClauseTopicWhat it asks for
7.4.1Purchasing processDocumented procedures. Criteria for evaluating and selecting suppliers, based on their ability to supply product that meets your requirements, their performance, and the effect of the purchased product on the quality of the device, and proportionate to the device's risk. Plan monitoring and re-evaluation; monitoring results feed re-evaluation. Address any failure to meet purchasing requirements with the supplier, proportionate to risk. Keep records of evaluation, selection, monitoring, re-evaluation and resulting actions.
7.4.2Purchasing informationSay clearly what you're buying: specifications, acceptance requirements, personnel qualification and quality system requirements as relevant, and, where applicable, a written agreement that the supplier tells you before making changes that affect the purchased product's ability to meet your purchasing requirements. Check the information is adequate before sending it, and keep it for traceability.
7.4.3Verification of purchased productInspect or otherwise verify purchased product, to an extent based on the supplier evaluation results and proportionate to risk. When you learn of a change to purchased product, decide whether it affects your processes or the device. Keep verification records.
4.1.5Outsourced processesYou stay responsible for any process you outsource. Controls must be proportionate to the risk and the external party's ability, and include written quality agreements.
8.4Analysis of dataData analysis includes suppliers, so supplier performance is part of the quality data you analyze to judge the system and find improvements.
4.2.5RecordsKeep records for at least the lifetime of the device as you define it, and never less than two years from release, or longer if a regulation requires it.

And by market:

United States

Since 2 February 2026, the QMSR requires a quality management system that meets ISO 13485. It adds no FDA-specific purchasing requirements.[2] Two changes still matter here. First, supplier audit reports are no longer exempt from FDA inspection, as they were under the old regulation.[3][4] Second, FDA's new inspection program makes "Outsourcing and Purchasing" one of six QMS areas, and its outsourcing element is part of every baseline surveillance inspection.[5]

European Union

Under the MDR and IVDR, the manufacturer's quality management system must cover resource management, "including selection and control of suppliers and sub-contractors".[6][8] Under the Annex IX conformity assessment route, where another party carries out design, manufacture or final verification and testing of the devices or parts of them, the QMS description must show the type and extent of control applied to that party (Annex IX, Section 2.2(b)). Notified body audits, including surveillance and unannounced audits, can extend to suppliers' and subcontractors' premises.[6][8]

Canada

Licence applications for Class II, III and IV devices must include a quality management system certificate showing that the system the device is manufactured under (and, for Class III and IV, designed under) meets CAN/CSA-ISO 13485. Those provisions say nothing about suppliers directly.[9] Since 1 January 2019, Health Canada has accepted only certificates issued under the Medical Device Single Audit Program (MDSAP),[10] so supplier controls come in through the ISO 13485 purchasing clauses that the certificate covers.

International guidance

GHTF/SG3/N17:2008 sets out a supplier control process in six phases: planning, selection, evaluation and acceptance, finalizing controls, delivery and monitoring, and feedback through CAPA.[11] IMDRF has consulted on a revision (consultation closed 6 July 2026). Check imdrf.org for the final version before you rely on the draft.[12]

How to build the list

This is the path from "we have some suppliers" to a list that holds up in an audit. Each step produces something you can point to.

  1. Define the scope

    Decide which suppliers must be on the list. A good rule: anyone whose product or service can affect the device, its quality records or your ability to meet regulatory requirements. Typically that means:

    • Suppliers of materials, components, subassemblies, labels and packaging
    • Outsourced processes: contract manufacturing, sterilization, plating, coating, cleaning, assembly
    • Services: calibration, testing laboratories, servicing, warehousing and logistics where they affect product
    • Software and SaaS used in production or the quality system, which must also be validated for its intended use[1]
    • Consultants and contract designers, when their work goes into the design or the quality system[3]
    • Distributors you buy through, alongside the original manufacturer of what they sell

    Write the exclusions down too, such as office supplies and travel, so nobody has to guess. Output: a scope statement in your purchasing procedure.

  2. Classify by risk

    Group suppliers by the effect of what they supply on the safety and performance of the device. Most companies use three classes, often called critical, major and minor. See the risk classes below. Output: a classification rule and a class for every supplier scope.

  3. Set evidence requirements per class

    For each class, decide what evaluation you need before approval and what controls apply afterwards: questionnaires, certificates, audits, samples or first article inspection, quality agreements. See the evidence table. Output: a matrix in your procedure.

  4. Evaluate and decide

    Collect the evidence, review it against your criteria, and record a decision with a status, a scope, a site and the approver's name. If a supplier falls short, GHTF's guidance points to a supplier development plan and re-evaluation, or moving on to another candidate;[11] many companies also approve with stated conditions. See the status values. Output: an approval record per supplier and scope.

  5. Put the agreements in place

    Purchasing information that says exactly what you're buying, and for outsourced processes and higher-risk suppliers, a written quality agreement. Both should include the commitment to notify you before changes.[1] Output: signed agreements, linked from the list.

  6. Record it on the list

    Enter each approval with the fields auditors and buyers need. See the field checklist. Output: the controlled ASL, with a revision history or audit trail.

  7. Connect it to purchasing

    Make the list the source your ERP or purchasing system checks: block purchase orders to suppliers, sites or part numbers outside the approved scope, and flag suppliers whose status or certificates have lapsed. Output: a purchasing control that works even when people forget.

Step 2 in detail: risk classes

ISO 13485 asks for selection criteria based on the effect of the purchased product on the quality of the device and proportionate to the device's risk.[1] It doesn't define classes. Three classes are common practice, and the table below is one example; what matters is that your rule is written down and applied consistently. Classify the scope, not the company: the same supplier can be critical for one part and minor for another.

ClassTypical testExamples
CriticalA defect could affect safety or essential performance, and you can't fully detect it on receipt. Also finished devices, accessories and outsourced processes that need validation.Contract manufacturer, sterilizer, biological raw materials for reagents, printed circuit assemblies, sterile barrier packaging
MajorAffects product quality or quality records, but defects are detectable by your verification, or the effect is limited.Machined parts fully inspected on receipt, labels, calibration and test laboratories, software used for quality records
MinorLittle or no effect on device safety or performance.Outer shipping cartons, generic hardware fully verified on receipt, cleaning supplies for non-production areas

Step 3 in detail: evidence by class

One size doesn't fit all. The evaluation and ongoing controls should get heavier as risk goes up. This matrix is an example to adapt, not a requirement.

MethodCriticalMajorMinor
Supplier questionnaireRequiredRequiredShort form or none
CertificatesRequired where relevant, with scope and site checkedRequired where relevant, e.g. ISO 13485, or ISO/IEC 17025 accreditation for labsOptional
Audit (on-site or remote)Usually before approval, unless justifiedWhen the risk or history calls for itNot usually
Samples or first article inspectionRequiredUsuallyAs needed
Process validation reviewRequired for outsourced processes that need validationWhere applicableNo
Quality agreementRequired, including change notificationUsually; at minimum change notification in purchasing termsStandard purchasing terms
Incoming verificationDefined per part; reduced only on evidenceDefined per partIdentity and quantity check

Certificates need reading, not just filing. An ISO 13485 certificate is useful evidence only if it covers the site that makes your part and the activities you're buying. A calibration lab's ISO/IEC 17025 accreditation covers the specific measurements in its accredited scope; a calibration outside that scope isn't covered. FDA has said certification on its own may not be enough, and that when an audit isn't practical, historical data, monitoring and trending, and inspection and testing can support the assessment.[3]

Step 4 in detail: status values

Statuses are company conventions too. Whatever you choose, define each one in your procedure: what it allows purchasing to do, and what it takes to move in and out of it. A common set:

  1. PendingBeing evaluated. No production purchases.
  2. Conditionally approvedApproved with stated conditions and a deadline, e.g. a corrective action or extra inspection.
  3. ApprovedApproved for the listed scope and site.
  4. RestrictedApproved only for named parts, processes or lots.
  5. On probationPerformance problems. Purchases continue with extra controls while corrective actions run.
  6. DisqualifiedNo new purchase orders. Open orders and stock dispositioned.
  7. InactiveNot used for a defined period. Re-evaluate before reuse.

Some companies merge "conditional" and "restricted", or skip probation. Fewer statuses are fine, as long as each one maps to a clear purchasing rule. GHTF's guidance also notes that a supplier that doesn't meet the criteria can be given a development plan and re-evaluated, rather than rejected outright.[11]

Step 6 in detail: the fields to keep

Use this as a checklist for your list or system. Each row is one approval (supplier, site and scope), so one supplier with two sites or two very different scopes gets two rows.

FieldWhy it mattersExample
Supplier legal entity and IDMatches contracts, invoices and the ERP vendor recordBrightrow Electronics Sdn Bhd · V-0142
Manufacturing siteYou approve where the work happens, not a head officePlant 1, Penang, Malaysia
Approved scopeStops a supplier approved for one thing from supplying anotherMain board assembly PCA-3300 only
Supplier typeManufacturer, outsourced process, service, distributorOutsourced process
Original manufacturerFor distributors, who actually makes itn/a
Risk classDrives controls and re-evaluation frequencyCritical
Status and conditionsTells purchasing what's allowedApproved
Approval date and approverShows who decided, and whenApproval record SUP-APR-0388
Evaluation basisLinks to the evidenceAudit report, questionnaire, first article inspection
Certificates and expiryExpiry dates drive renewal requestsISO 13485, site-specific, with expiry date
Quality agreement and revisionShows responsibilities and change notification are agreedQA-0142 rev C
Last and next re-evaluationKeeps re-evaluation planned, not rememberedNext due date
Next audit dueFeeds the supplier audit scheduleNext due date
Sole or single sourceFlags supply risk and the need for contingency plansSingle source
OwnerOne accountable person per supplierSupplier quality engineer

Keep the evidence in the supplier file and link it from the list. The list should stay readable at a glance.

A worked example

Fictional example

Lumivale Diagnostics makes a benchtop immunoassay analyzer, single-use reagent cartridges, and a sample collection kit with a sterile swab. Its ASL excerpt looks like this. All companies are invented.

Supplier and siteApproved scopeClassStatusKey evidence
Quillmere Biologics · Plant 2Monoclonal antibodies RM-1102 and RM-1103 for reagent manufactureCriticalApprovedOn-site audit, ISO 13485 certificate covering Plant 2, quality agreement with change notification, lot-by-lot certificate of analysis plus in-house functional testing
Sterivane Processing · Site AEthylene oxide sterilization of swab SW-210CriticalApprovedSterilization validation reviewed, audit, quality agreement, load records reviewed for each release
Brightrow Electronics · Plant 1Main board assembly PCA-3300CriticalApprovedAudit, first article inspection, quality agreement
Brightrow Electronics · Plant 2None yet (proposed second line for PCA-3300)CriticalPendingChange notice received; evaluation under change control
Corran Molding · Main plantCartridge housings CH-40 and CH-41CriticalOn probationTwo dimensional nonconformances in one quarter; SCAR open; tightened incoming inspection
Tessaly Calibration LabCalibration of pipettes, balances and thermometers within its accredited scopeMajorRestrictedISO/IEC 17025 accreditation and scope reviewed; torque calibration not in scope, so not approved for it
Vantrel Components (distributor)Connector CN-77, made by Haskett InterconnectMajorConditionalAuthorized distributor letter pending; manufacturer's certificate of conformance required with each lot
Orrin Fold PackagingOuter shipping cartons PK-500 onlyMinorApprovedQuestionnaire, sample approval, identity check on receipt

Then a change notice arrives

Brightrow writes to say it wants to move part of the PCA-3300 volume to its second plant. Because the quality agreement requires notice before changes, Lumivale hears about it in advance, not from a failed lot.

  1. Log it as a change. Lumivale opens a change request, because a new manufacturing site for a critical assembly can affect the device. (See Change Request, Change Order, ECO or Deviation for how requests and orders split the work.)
  2. Add the site as pending. Plant 2 gets its own ASL row with status "Pending". The ERP blocks purchase orders for PCA-3300 from that site.
  3. Evaluate the site. Remote audit of Plant 2, review of its process validation and test coverage, first article inspection of boards from the new line.
  4. Assess the impact. Does the change affect verification, risk controls or regulatory status in each market? Record the conclusion, including "no submission needed" and why.
  5. Approve and release. The change order approves Plant 2 for PCA-3300, updates the quality agreement and purchasing information, and sets effectivity from a named lot.

Meanwhile, Corran Molding's probation follows its own path. The SCAR asks Corran to find the root cause of the dimensional drift (see the root cause analysis guide), tightened inspection stays in place, and the probation has an exit criterion written into the record: three consecutive conforming lots after the corrective action is verified.

Keeping it current: monitoring and re-evaluation

ISO 13485 requires you to plan supplier monitoring and re-evaluation, monitor performance against purchasing requirements, and use the monitoring results in re-evaluation.[1] In practice, the inputs are:

Receiving inspection resultsNonconformancesSCARs and their effectivenessComplaints traced to supplied productOn-time, complete deliveryAudit findingsChange notices received, and changes made without noticeCertificate status

Delivery and price matter to the business, but a supplier with perfect delivery and a rising nonconformance rate is a quality problem. Weight quality data heavily in any scorecard.

Re-evaluation frequency

The standard doesn't set intervals. Base them on risk and adjust for performance. An example:

ClassPerformance reviewRe-evaluationAudit
CriticalQuarterlyAnnuallyEvery 1 to 3 years based on risk and history, and when triggered
MajorEvery 6 to 12 monthsEvery 2 yearsWhen triggered
MinorAnnuallyEvery 3 years, or on reuse after inactivityNot usually

Triggers that should bring a re-evaluation or audit forward: a SCAR that isn't effective, a complaint traced to a supplier, a change notice, a change made without notice, a lapsed certificate, an acquisition or a site move.

A maintenance calendar

Every month

  • Certificates expiring in the next 90 days: request renewals
  • Conditions and probations past their deadline
  • Open SCARs and their due dates

Every quarter

  • Performance review for critical suppliers
  • Supplier quality trends into your data analysis[1]
  • Audit schedule check

Every year

  • Re-evaluations falling due
  • Suppliers with no purchases in 12 to 24 months: move to inactive
  • Sole-source review and contingency plans
  • Quality agreements due for review

When things change

The supplier changes something

A new site, a new process, new equipment, a new sub-tier supplier, a new material grade. Your agreement should require notice before the change.[1] When it arrives, decide whether the change affects your processes or the device, as clause 7.4.3 requires, and run anything that does through change control.

A change discovered after the fact is a nonconformance against your purchasing agreement: assess the product already received and ask for corrective action.

You change the supplier's status

Write down what happens to everything in flight:

  • Open purchase orders: continue, hold or cancel
  • Stock and work in progress: use, re-inspect, quarantine or return
  • Product already shipped: assess whether it's affected
  • Alternate sources: who can step in, and how long qualification takes

GHTF's guidance describes the options when a supplier can't meet its corrective action obligations: re-evaluate its continued suitability, support it with training or resources, redefine responsibilities, or change to another supplier.[11]

Distributors and manufacturers

When you buy through a distributor, record both: the distributor that sells to you, and the original manufacturer that makes the part. Evaluate the distributor for handling, storage and traceability, and get assurance that the parts come from the manufacturer you approved, for example through authorized distributor status and the manufacturer's certificate of conformance.

Sole and single sources

Flag them on the list. Where you can't switch suppliers, GHTF suggests more communication with the supplier and, if needed, extra controls.[11] Add a contingency plan: safety stock, last-time-buy triggers, and a realistic estimate of how long qualifying an alternate would take, including any validation and regulatory work.

Common mistakes, and the fix

Approving the company, not the site.

A head-office address on the list, with parts made somewhere else. Approve each manufacturing site separately.

No scope on the approval.

A supplier approved for shipping cartons quietly starts supplying a critical component. Record the approved parts, processes or services, and enforce them in purchasing.

Trusting the certificate alone.

The ISO 13485 certificate covers a different site or different activities. Read the scope and the site, and add your own evaluation.[3]

Expired certificates nobody noticed.

Track expiry dates as fields and review them monthly.

No change notification clause.

You find out about a supplier's process change from a failed lot. Put advance notice in the quality agreement or purchasing terms.[1]

Approval once, re-evaluation never.

Plan re-evaluation by risk class, and actually use the monitoring data when you do it.[1]

The list lives apart from purchasing.

A spreadsheet in quality, a vendor master in the ERP, and no link between them. Make the ASL the source purchasing checks.

Distributors instead of manufacturers.

The distributor is on the list; nobody knows who makes the part. Record and assess both.

Same controls for everyone.

Full audits for carton suppliers and a questionnaire for the sterilizer. Scale the controls to risk.[1]

No record of why.

A status changed but there's no reason, date or approver. Every status change needs all three.

The consequences are concrete. Under the QMSR, failing to meet an applicable requirement makes the device adulterated.[2] In PMA preapproval inspections, FDA follows up problems found at a component manufacturer through the finished device manufacturer's outsourcing and purchasing activities, and cites them on that manufacturer's Form 483.[5] In the EU, unless the audit programme already covers it, the notified body must audit process controls at a supplier's premises when the supplier's activity significantly influences the conformity of finished devices, in particular when the manufacturer can't demonstrate sufficient control over its suppliers.[7]

Common questions

Do we have to keep a list at all?

Not by that name. You do need records of supplier evaluation, selection, monitoring and re-evaluation, and purchasing has to know who is approved for what.[1] A list, or a supplier module that works like one, is simply the clearest way to show it.

Do we need to audit every critical supplier?

Not necessarily, but you need a justified evaluation. FDA has acknowledged that audits aren't always practical, and that historical data, monitoring and trending, and inspection and testing can support the assessment.[3] For outsourced processes that need validation, such as sterilization, an audit is usually the most direct evidence, because you can't verify the result by inspection.

Is an ISO 13485 certificate enough to approve a supplier?

It's good evidence, not a complete evaluation. Check that it covers the right site and activities, and that it's current. FDA has said certification may not provide adequate assurance without further evaluation.[3]

Do other sites of our own company count as suppliers?

If another site supplies product or services into your device, control it like a supplier, usually with an internal quality agreement instead of a commercial contract. GHTF's supplier guidance says internal suppliers, such as parts of the organization working under a separate quality system, are to be controlled in a similar way to external ones, with a formal arrangement such as an interface agreement where there's no contract. The IMDRF draft revision keeps that principle.[11][12]

What about consultants and software vendors?

Include them when their work affects the device or the quality system. FDA expects you to decide what you need from a consultant and assess whether they can deliver it.[3] For software used in production or the quality system, the vendor evaluation sits alongside your own validation of the software for its intended use.[1]

Can we keep buying from a disqualified supplier while we qualify a new one?

Only through a decision you document: a risk-based justification, extra controls such as full inspection, a time limit and an approver. That is usually a conditional or restricted status with a deadline, not an informal exception.

References

  1. ISO 13485:2016, Medical devices — Quality management systems — Requirements for regulatory purposes (last reviewed and confirmed by ISO in 2025), clauses 4.1.5, 4.1.6, 4.2.5, 7.4.1, 7.4.2, 7.4.3, 7.5.6 and 8.4. www.iso.org/standard/59752.html
  2. 21 CFR Part 820, Quality Management System Regulation (QMSR), § 820.10, including paragraph (e), effective 2 February 2026. www.ecfr.gov/current/title-21/chapter-I/subchapter-H/part-820/subpart-A/section-820.10
  3. U.S. FDA, Medical Devices; Quality System Regulation Amendments, final rule, Federal Register Vol. 89, No. 23, 2 February 2024 (FR Doc. 2024-01709), responses to Comments 33, 40 and 55. www.govinfo.gov/content/pkg/FR-2024-02-02/html/2024-01709.htm
  4. U.S. FDA, Quality Management System Regulation: Frequently Asked Questions (inspection of management review, quality audit and supplier audit reports). www.fda.gov/medical-devices/quality-management-system-regulation-qmsr/quality-management-system-regulation-frequently-asked-questions
  5. U.S. FDA, Compliance Program 7382.850, Inspection of Medical Device Manufacturers, implementation date 2 February 2026 (QMS area "Outsourcing and Purchasing"; supersedes the program of the same name issued 29 September 2023, formerly CP 7382.845, and CP 7383.001). www.fda.gov/media/80195/download
  6. Regulation (EU) 2017/745 (EU MDR), Article 10(9)(d) and Annex IX, Sections 2.2(b), 2.3, 3.3 and 3.4. eur-lex.europa.eu/eli/reg/2017/745/oj
  7. Regulation (EU) 2017/745 (EU MDR), Annex VII, Section 4.5.2 (notified body quality management system auditing, including audits at suppliers' premises). eur-lex.europa.eu/eli/reg/2017/745/oj
  8. Regulation (EU) 2017/746 (EU IVDR), Article 10(8)(d) and Annex IX, Sections 2.2(b), 2.3, 3.3 and 3.4. eur-lex.europa.eu/eli/reg/2017/746/oj
  9. Health Canada, Medical Devices Regulations (SOR/98-282), section 32, paragraphs (2)(f), (3)(j) and (4)(p). laws-lois.justice.gc.ca/eng/regulations/SOR-98-282/section-32.html
  10. Health Canada, Notice: Transition Plan for the Medical Device Single Audit Program (MDSAP), 4 December 2015 ("As of January 1, 2019, only MDSAP certificates will be accepted"). www.canada.ca/en/health-canada/services/drugs-health-products/medical-devices/activities/international/notice-transition-plan-medical-device-single-audit-program.html
  11. Global Harmonization Task Force, GHTF/SG3/N17:2008, Quality Management System — Medical Devices — Guidance on the Control of Products and Services Obtained from Suppliers, 11 December 2008, Sections 1.0 and 3.1 to 3.6. www.imdrf.org/sites/default/files/docs/ghtf/final/sg3/technical-docs/ghtf-sg3-n17-guidance-on-quality-management-system-081211.pdf
  12. IMDRF Quality Management Systems Working Group, Guidance on the Control of Products and Services Obtained from Suppliers, draft revision of GHTF/SG3/N17:2008, public consultation closed 6 July 2026. www.imdrf.org/news-events/consultation-guidance-control-products-and-services-obtained-suppliers (draft: consolidated draft PDF)

Regulations and guidance were checked against primary sources at the time of writing. Risk classes, status values, evidence matrices and re-evaluation intervals shown here are common practice and examples, not regulatory requirements. All companies in the worked example are fictional.

Previous
Previous

Equipment at a Medical Device Company: Qualify, Calibrate, Maintain, Retire

Next
Next

FDA Finalizes Its 510(k) Clearance Transfer Q&A Guidance: What New and Previous Holders Need to Do