Guide · Equipment · 23 min read
Equipment at a Medical Device Company: Qualify, Calibrate, Maintain, Retire
Every claim a device company makes rests on equipment somewhere: the tester that proved the design, the sealer that closed the sterile pouch, the gauge that accepted the part. This guide maps where equipment shows up from first prototype to field service, what ISO 13485, the FDA's QMSR and the EU regulations expect of it, and how to bring a piece of equipment into service, keep it under control and retire it without losing the evidence behind your product.
- 1PlanNeed, requirements, risk
- 2QualifyInstall, test, calibrate
- 3ReleaseApproved for use
- 4MaintainPM, calibration, status
- 5ChangeRepair, move, update
- 6RetireRemove, keep records
Where equipment shows up
"Equipment" covers far more than the production floor. ISO 13485 counts process equipment, both hardware and software, as part of the infrastructure a company has to define and maintain, and treats monitoring and measuring equipment as its own controlled category.[3] In practice, equipment touches every phase of a product's life. What changes from phase to phase is the job it does, and so the control it needs.
R&D and feasibility
Bench instruments, prototyping tools, 3D printers, early test rigs, lab balances and pipettes.
Control it needs: light, until its data starts to count. The moment a measurement feeds a design input, a verification or validation result, or a regulatory submission, the instrument must be calibrated and identified like any other measuring equipment.
Design verification and validation
Tensile and force testers, environmental chambers, fixtures, leak testers, analyzers used in performance studies.
Control it needs: calibration that is current on the day of the test, validated test methods where the method is your own, and test records that identify the equipment used, so you can trace an out-of-tolerance finding back to the results it touched.[3]
Manufacturing
Molding machines and tooling, assembly stations, pouch and tray sealers, sterilizers, dispensers and fillers, inspection gauges, vision systems, cleanroom monitoring.
Control it needs: qualification; installation, operational and performance qualification wherever a process's output can't be fully verified afterwards; preventive maintenance at defined intervals; calibration of the instruments that control and check the process.[3][6]
Quality control labs
Incoming inspection gauges and comparators, microscopes, plate readers, spectrophotometers, analyzers and incubators used to release reagents and kits.
Control it needs: calibration or verification before results are used for acceptance or release, environmental monitoring where conditions affect results, and validated software where the instrument calculates or stores results.[3]
Servicing
Field service test kits, torque drivers, electrical safety testers, calibrators carried to customer sites.
Control it needs: the same calibration and status controls as in-house measuring equipment, plus protection during transport, because a service record is only as good as the instrument behind it.[3][16]
Software in and around equipment
Controller firmware, vision inspection algorithms, data acquisition software, the instrument PC that calculates results, the calibration management system.
Control it needs: validation before first use and after changes, scaled to the risk, for software used in production, in measurement and in the quality system. ISO/TR 80002-2 gives worked approaches.[3][8][10]
What the regulations and standards say
Under the Quality Management System Regulation (QMSR), which took effect on 2 February 2026, FDA incorporates ISO 13485:2016 by reference, so US manufacturers now work to the same ISO 13485 equipment clauses as companies certified to the standard elsewhere.[1][2] ISO confirmed the 2016 edition as current in its 2025 review.[3] The old Quality System Regulation sections on equipment maintenance and on inspection, measuring and test equipment, formerly 21 CFR 820.70(g) and 820.72, are no longer in Part 820; cite the ISO clauses instead.[1][8] Here are the requirements that matter, in plain language.
| Source | What it asks for | What it means for equipment |
|---|---|---|
| ISO 13485 6.3 Infrastructure | Documented requirements for infrastructure, including process equipment (hardware and software). Where maintenance, or the lack of it, can affect product quality, documented maintenance requirements including how often it's done, applied as appropriate to production, work environment and measuring equipment. Records of maintenance.[3] | A maintenance plan with intervals for each item that matters, and records showing it was followed. |
| ISO 13485 6.4 Work environment | Documented requirements for the work environment where it can affect product quality, and planned arrangements to control contamination.[3] | Cleanroom particle counters, differential pressure gauges, temperature and humidity monitors, and storage chambers all fall under your equipment controls. |
| ISO 13485 7.5.1 Production control | Production controls include, as appropriate, qualification of infrastructure and the availability and use of monitoring and measuring equipment.[3] | Equipment used in production is qualified before use, and operators have the right measuring equipment at the point of use. |
| ISO 13485 7.5.6 Process validation | Validate processes whose output can't be or isn't verified by later monitoring or measurement. Procedures cover equipment qualification, revalidation criteria and approval of changes. Software used in production is validated before first use and, as appropriate, after changes, in proportion to risk.[3] | Installation, operational and performance qualification for the equipment that runs validated processes, plus written triggers for revalidation. |
| ISO 13485 7.6 Monitoring and measuring equipment | Where needed for valid results, measuring equipment is calibrated or verified, or both, at specified intervals or before use, against standards traceable to international or national measurement standards (or the basis is recorded where none exist); adjusted as needed with adjustments recorded; identified to show calibration status; safeguarded from adjustments that would invalidate results; protected during handling, maintenance and storage. When equipment is found not to conform, the validity of previous results is assessed and recorded, and action is taken on the equipment and affected product. Software used for monitoring and measurement is validated.[3] | The core of every calibration program: traceability, status labels, tamper protection, and an impact assessment when something is found out of tolerance. |
| ISO 13485 8.2.6 Product monitoring | Records of product acceptance identify, as appropriate, the test equipment used.[3] | Without equipment IDs in your records, you can't find what an out-of-tolerance instrument affected. |
| ISO 13485 4.1.6 and 4.2.5 QMS software, records | Software used in the quality system is validated, in proportion to risk. Records are kept for at least the lifetime of the device as defined by the organization, and not less than two years from release, or longer if regulations require.[3] | Your calibration and maintenance system is QMS software and needs validating. Equipment records outlive the equipment. |
| EU MDR and IVDR Annex IX, Section 2.2(e) | The quality management system documentation submitted to the notified body describes the tests carried out before, during and after manufacture, how often, and the test equipment used, and the calibration of that test equipment must be adequately traceable.[4][5] | Your notified body will expect to see test equipment and its calibration traceability described in the QMS documentation. |
| 21 CFR Part 11 US only | Applies to records kept in electronic form under FDA record requirements, and to electronic signatures on them.[9] | FDA's software assurance guidance says documents required under Part 820 that are kept electronically generally count as Part 11 records, which covers many calibration, maintenance and equipment data records.[8] |
Three supporting documents fill in the how:
- GHTF/SG3/N99-10:2004, Process Validation Guidance. Still listed among the final GHTF documents that IMDRF hosts, and a long-standing reference for installation, operational and performance qualification and for deciding whether a process must be validated or can be verified.[6]
- FDA, Computer Software Assurance for Production and Quality Management System Software (February 2026). A risk-based approach to software used in production and the quality system, including software in production equipment. It replaces the September 2025 version and Section 6 of FDA's older software validation guidance.[8]
- OIML D 10 / ILAC-G24 (2022), guidelines for setting and reviewing recalibration intervals. Written for laboratories, but it explicitly applies to manufacturers that use measuring equipment.[16]
How much control does this equipment need?
ISO 13485 asks for a risk-based approach to controlling QMS processes, and the equipment clauses repeat the idea: maintenance requirements apply where maintenance can affect product quality, and software validation is proportionate to risk.[3] Many companies translate that into a small number of control levels. ISO 13485 doesn't define levels; the five below are one common way to set them up, not a requirement.
| Level | Typical equipment | Typical controls |
|---|---|---|
| 1 Support only | Hand tools, carts, general glassware, display-only gauges nobody relies on | Keep in good condition. Label anything with a scale "no calibration required" or "for indication only" so it isn't used for acceptance. |
| 2 Reference only | Early feasibility instruments whose data no decision depends on | Asset ID and a "reference only" label. Bring into the calibration program before any of its data is used for design evidence. |
| 3 Calibrated | Gauges, testers, analyzers, balances, environmental monitors used for verification, acceptance, release or monitoring | Traceable calibration at defined intervals or before use, status label, safeguarding, out-of-tolerance impact assessment, equipment ID in test records. |
| 4 Qualified process | Process equipment whose output is fully checked afterwards, such as a cutting fixture followed by 100% dimensional inspection | Installation qualification, operating procedure, maintenance plan, calibration of setpoint and monitoring instruments, verification of the output. |
| 5 Validated process | Sealers, sterilizers, molding machines, bonding and welding equipment, automated inspection that replaces human checks | Installation, operational and performance qualification; revalidation criteria; preventive maintenance; calibration of critical instruments; change control on any change to equipment, settings or software. |
Software adds a layer at any level: if the equipment's software controls a process, calculates results or stores quality records, validate it in proportion to the risk.[3][8]
Try it
1. What does the equipment do?
2. Can every unit's output be fully checked afterwards, without destroying it?
2. What are the results used for?
3. Does software control it, calculate results or store records?
Introducing equipment, step by step
New equipment often arrives as a purchase order and leaves receiving as "ready to use." The steps in between are where most later problems start. Scale each step to the control level; a new caliper needs a fraction of what a new sterilizer needs.
- Define the need and the requirements
Write a user requirements specification: what the equipment must do, the range and accuracy it needs, utilities, safety, cleanability, data output, user access levels and alarms. For measuring equipment, compare the instrument's capability with the tolerance it will judge; an instrument whose uncertainty eats most of the tolerance will create false passes and false fails.
- Assess what it affects
Decide what the equipment touches (product quality, design evidence, environment, records) and give it a control level. This decision drives everything after it, so record the reasoning.[3]
- Select the supplier
Equipment suppliers, calibration labs and service providers are suppliers under your purchasing controls, evaluated and monitored in proportion to their effect on your product.[3] For calibration providers, check that their accreditation scope covers the parameters, ranges and uncertainties you need.[11]
- Buy, receive and inspect
Check the delivery against the order and the requirements. Factory and site acceptance tests are common for complex equipment; their results can count toward qualification if they're documented and still valid after shipping and installation.
- Install and qualify
Installation qualification for anything at level 4 or 5; operational and performance qualification where the process is validated. The next section explains each stage.[6]
- Calibrate before first use
Calibrate or verify every instrument that controls or measures something that matters, including sensors built into process equipment. A certificate shipped with new equipment can be accepted if it's traceable, from a competent provider, covers the points you use, and you've considered whether transport could have affected it.[3][16]
- Identify it and show its status
Give it a unique ID, register it, and label its status: in service with calibration due date, reference only, or no calibration required. Seal adjustment points that would invalidate a calibration.[3]
- Write procedures and train
Operating, cleaning, set-up and daily check instructions; who may change settings; what to do when an alarm or failed check occurs. Train and record before people use it.[3]
- Plan maintenance and calibration
Set preventive maintenance and calibration intervals and write down the basis: manufacturer recommendations, use, environment, drift risk, the consequence of failure. New equipment usually starts on a shorter interval until it builds a history.[3][16]
- Release to use
Approve release through your change control, so the equipment record, qualification reports, procedures, training and any updated routings or validation documents become effective together. Only then switch the status to in service. Our guide to change requests and change orders covers that process.
- Keep the records together
Requirements, risk assessment, purchase and receiving records, qualification protocols and reports, certificates, procedures and training, linked to the equipment ID.[3]
IQ, OQ and PQ in plain language
Installation, operational and performance qualification are the usual way to show that equipment running a validated process does what it should. GHTF's process validation guidance defines all three, and ISO 11607-2 applies the same structure to sealing, forming and assembly of sterile barrier systems.[6][7] The pouch sealer row is a fictional illustration; its checks and run counts reflect common practice, not requirements.
| Installation (IQ) | Operational (OQ) | Performance (PQ) | |
|---|---|---|---|
| The question | Is it the right equipment, installed correctly? | Across its operating range, which settings give good product, and where are the limits? | Under normal production conditions, does it make good product consistently? |
| Typical checks | Model and configuration match the order; utilities, environment and wiring; safety features; software and firmware versions recorded; instruments calibrated; manuals, spare parts, maintenance and cleaning schedules in place[6] | Process limits for parameters such as time, temperature and pressure; worst-case challenges at the edges of the window; alarms and interlocks; operating procedures and training ready[6] | Repeated runs at the chosen settings with normal operators, shifts and material lots; capability and repeatability; long-term stability where it matters[6] |
| Pouch sealer example | Sealer installed on a level bench, compressed air at the specified pressure, temperature controller and pressure gauge calibrated, firmware version noted, spare jaws stocked | Seals made at the low and high corners of temperature, dwell time and pressure; peel strength and seal integrity tested at each corner to set the validated window | Three production-sized runs at nominal settings, different operators and pouch lots, all meeting seal strength and integrity requirements |
| Output | Signed IQ report; equipment ready to test | Validated parameter window and operating procedure | Evidence the process is ready for routine production |
Keeping equipment in a state of control
Release is the start. Most equipment findings come from what happens over the following years: an interval nobody revisited, a repair nobody assessed, a move nobody requalified.
Preventive maintenance
Follow the plan and record what was done, by whom and when, including parts replaced. Overdue maintenance on equipment where maintenance affects quality is a reason to stop and assess, not just reschedule.[3]
Calibration intervals
Review intervals using history. OIML D 10 / ILAC-G24 describes methods such as extending or shortening the interval after each calibration based on how close the result came to its limit, control charts of drift, intervals based on hours of use, and frequent in-service checks with full calibration only when a check fails. It advises against fixed intervals unless a normative document specifies them.[16]
Reading the certificate
Review every certificate: as-found and as-left values, measurement uncertainty, the points tested, and how any pass or fail statement was decided. Under ISO/IEC 17025, a lab that states conformity must document the decision rule it applied (the rule for how measurement uncertainty is accounted for) and the risk that rule carries.[11][14]
Status and tagging
Status should be visible at the point of use and in the system: in service, out of service, limited use, reference only. Equipment that's overdue, failed a check or is under repair gets tagged out of service and segregated so it can't be used by mistake.[3]
Repairs
After a repair, decide what's needed before return to use: recalibration, a functional check, or partial requalification. Like-for-like part replacement may need only a check; a new controller or heating element on validated equipment may need part of the OQ repeated. Write the decision down.[6]
Changes and moves
Moving equipment to a new room or site, changing utilities or settings, or using it for a new product are changes. GHTF lists process changes, transfer to another facility and changes in application among the reasons to revalidate.[6] Route them through change control with a revalidation decision.
Software and firmware
Treat vendor updates as changes: read the release notes, assess the impact on control functions, alarms and data, and test in proportion to risk before use. FDA's software assurance guidance gives features that maintain process parameters such as temperature or pressure, where those affect product quality, as examples of generally high process risk.[3][8]
Periodic review
Review validated equipment on a schedule: changes since validation, repairs, out-of-tolerance events, nonconformances and trends. GHTF lists negative trends in quality indicators among the reasons to revalidate, and notes that small changes can add up over time, a reason to consider periodic revalidation.[6]
Spares, vendors and environment
Specify critical spare parts so replacements don't quietly change the process. Keep vendor service reports with the equipment record and review them like your own. Control the environment the equipment needs; protect measuring equipment during handling, storage and transport.[3]
Data integrity
Control who can change setpoints, recipes and calibration factors; keep audit trails where the equipment stores quality data; back data up before it leaves the instrument PC. FDA's software assurance guidance recommends basing assurance on a documented risk assessment that considers record integrity, and allows a risk-based approach for Part 11 records.[8]
When calibration finds it out of tolerance
An as-found reading outside its limits means every result since the last good calibration is in question. ISO 13485 requires you to assess and record the validity of those earlier results and to act on both the equipment and any affected product.[3] Here's the usual flow.
- 1 · DetectAs-found reading outside its limits
Found at calibration, during a daily check, or after damage. Record the as-found values before anyone adjusts anything.
- 2 · ContainTag it out of service
Stop use, segregate it, and open a nonconformance or out-of-tolerance record.
- 3 · DecideIs the error significant for what it measured?
Compare the error, plus measurement uncertainty, with the tolerances it judged or the process window it controlled. An error within the tolerance the instrument was checking against may not affect any decision.
NoRecord the rationale, then go to step 6.Yes, or not sureContinue to step 4. - 4 · TraceFind everything it touched
Use equipment IDs in production, test and inspection records to list every lot, test, verification report and service record since the last good calibration. This is why records need to identify the equipment used.[3]
- 5 · AssessCould any product or result be wrong?
Re-evaluate results using the known error. Check whether released product could be outside specification, and whether design verification or validation conclusions still hold.
NoDocument the assessment, then go to step 6.YesHandle as nonconforming product: contain, disposition, and evaluate field action and reporting obligations. Repeat affected tests. - 6 · FixAdjust, repair or replace
Record the adjustment and as-left values, and recalibrate.[3]
- 7 · LearnFind the cause and review the interval
Why did it drift: wear, damage, environment, misuse, an interval too long? Open a CAPA when the cause is systemic or recurring. Our root cause analysis guide covers the methods.
- 8 · ReturnReturn to service
Update the status label and system record, and close the out-of-tolerance record with its impact assessment attached.
Retiring equipment
Retirement looks simple and is often done badly. The equipment leaves, but the products it made, the tests it ran and the procedures that name it all stay behind. Many companies use two end states: in storage for equipment taken out of use but expected back, which needs requalification or at least recalibration before return, and retired for equipment leaving for good.
- Decide and approve. Record why (end of life, replaced, process discontinued) and approve retirement through change control.
- Take a final as-found calibration on measuring equipment whose data still matters. A final out-of-tolerance result triggers the same impact assessment as any other.[3]
- Tag and segregate it so it can't be used, then change its status in the system.
- Find where it's referenced: work instructions, routings and manufacturing instructions, inspection plans, validation reports, test methods, risk files, training.
- Update or supersede those documents in the same change, so nothing points to equipment that no longer exists.
- Qualify the replacement before the old one leaves, and document equivalence. Same model doesn't mean same process; a new unit still needs its own qualification.[6]
- Retrieve the data stored on the equipment or its PC, in a readable format, before disposal.
- Keep the records for at least the lifetime of the devices it was used for, and not less than two years from release, or longer where regulations require.[3][4]
- Decontaminate equipment that held product, chemicals or biological material, and document it.
- Dispose, sell or return it with your asset tags and status labels removed, and close out open service contracts and spare parts.
Worked example: one sealer, start to finish
Ardent Point Medical (a fictional company) makes a single-use sterile skin biopsy punch, packed in a peelable pouch and sterilized after packing. The pouch seal keeps the device sterile until use, and seal integrity can only be fully proven by destructive testing. So the sealer runs a validated process.
- PlanningRequirements and risk
The team writes a user requirements specification: temperature, dwell time and pressure ranges; alarms when any drifts out of range; password-protected settings; a cycle log. Risk assessment rates it level 5: a bad seal could compromise sterility, and the output can't be fully checked without destroying it.[3][7]
- PurchaseSupplier and calibration provider
The sealer supplier is approved through purchasing controls. The calibration lab is accredited to ISO/IEC 17025, and its scope covers temperature and pressure in the ranges needed.[11]
- QualificationIQ, OQ, PQ
IQ confirms utilities, installation and calibrated sensors, and records the firmware version. OQ tests the corners of the parameter window, including a temperature 5 °C above the planned upper limit, and sets the validated window. PQ runs three production-sized lots across operators and pouch lots. All pass.[6][7]
- ReleaseIn service
A change order releases the equipment record, validation report, work instruction and training together. The temperature controller starts on a six-month calibration interval because the sealer is new; the pressure gauge on twelve months. Operators run a seal-strength check at start-up each shift.
- Month 12Out of tolerance
Calibration finds the controller reading 4 °C low, so the jaws have run up to 4 °C hotter than displayed. The sealer is tagged out of service. Production records identify the sealer by ID, so quality lists the 38 lots sealed since the last good calibration. The worst-case actual temperature stayed within the range OQ proved acceptable, and the start-of-shift seal-strength checks show no change. Product is accepted with a documented rationale. The cause is a degrading thermocouple; it's replaced and the controller recalibrated. Had the error pushed the temperature outside the OQ-tested range, those lots would have been handled as nonconforming product.
- Year 2Firmware update
The vendor offers firmware that fixes an alarm-logging bug. A change request assesses the release notes: control functions unchanged, logging changed. The team verifies alarms, setpoint limits and the cycle log, repeats OQ seals at the window corners, and updates the firmware version on the equipment record before release.[8]
- Year 3Line move
The packaging line moves to a new cleanroom. Under the revalidation criteria, the move needs a new IQ for utilities and installation and a shortened PQ. Nothing is sealed for sale until both pass.[6]
- Year 6Replacement and retirement
A newer sealer with automatic data logging gets its own IQ, OQ and PQ. One change order then releases the new validation report, work instruction and routing, and retires the old sealer. Its final as-found calibration is within limits, confirming results since the last calibration. Its records are kept for the device lifetime Ardent Point defined. The unit is cleaned, its tags removed, and it's sold for parts.[3]
Common mistakes, and the fix
A prototype-lab instrument, never calibrated, produced the data in a design verification report. Decide at design planning which equipment will produce design evidence, and calibrate it before the test, not after.
The lab holds ISO/IEC 17025 accreditation, but its scope doesn't cover the parameter, range or uncertainty you need. Check the scope, not just the certificate on the wall.[11]
An out-of-tolerance as-found value sat in a certificate for months. Review every certificate on receipt and record the review.
The instrument was adjusted and returned to use with no assessment of earlier results. ISO 13485 requires one, recorded.[3]
Everything on twelve months because that's how it's always been. Set the initial interval from risk and evidence, and adjust it from calibration history.[16]
Equipment relocated over a weekend and back in production on Monday. Treat moves as changes with a revalidation decision.[6]
A routine visit included a software update nobody assessed. Require vendors to tell you before changing software, and route updates through change control.
Rented, borrowed, supplier-owned or customer-owned equipment used without being registered, calibrated or labeled. If it measures or makes your product, it's in the program.
Retired or out-of-service equipment still on the floor, or labels that don't match the system. Segregate it, and audit labels against records.
A tracker that depends on one person, and equipment used past its due date. Use a system that flags upcoming work and takes overdue equipment out of service automatically.
Test records say "caliper" but not which one. When one is found out of tolerance, there's no way to find what it affected. Record the equipment ID.[3]
Common questions
Does R&D equipment need to be calibrated?
Not while its data informs only early exploration. Once its results support a design input, a verification or validation conclusion, or a submission, it needs the same controls as any measuring equipment.[3]
Read more
A simple way to manage it: label uncalibrated lab equipment "reference only" and make "is the equipment calibrated?" a line in every verification and validation protocol. If a test was run on uncalibrated equipment, either calibrate it and show the as-found results were within tolerance, or repeat the test.
Does every piece of equipment need IQ, OQ and PQ?
No. Full qualification is for equipment that runs a validated process. Measuring equipment is controlled through calibration, and process equipment whose output you fully verify usually needs installation qualification and a procedure.[6]
Read more
Write the rule into your procedure, with examples, so the decision isn't made from scratch for each purchase. Record the decision for each item of equipment.
Do we have to use an ISO/IEC 17025 accredited calibration lab?
ISO 13485 requires traceable calibration, not accreditation. But accreditation for the right scope is the simplest way to show competence and traceability, and many companies require it for anything above basic support equipment.[3][11]
Read more
NIST's traceability policy makes the point that whoever provides a measurement result is responsible for supporting a traceability claim, and the user of the result is responsible for assessing it.[17] If you use a non-accredited provider, evaluate it as a supplier and keep the evidence: its procedures, reference standards and their traceability, uncertainty estimates and staff competence.[3]
Can we calibrate in-house?
Yes, with documented procedures, reference standards that are themselves calibrated and traceable, trained staff, and an estimate of measurement uncertainty.[3]
Read more
Reference standards are equipment too: they need IDs, intervals, status and the same out-of-tolerance handling. An out-of-tolerance reference standard can affect every instrument calibrated with it.
What does "no calibration required" mean on a label?
It means you've decided the instrument isn't used for any measurement that matters, and recorded why. The label stops someone using it for acceptance by mistake.
Read more
Review these decisions when the equipment's use changes. A display-only thermometer that becomes the only temperature check on a process is no longer "no calibration required."
Does 21 CFR Part 11 apply to equipment data?
In the US, where the data are records FDA regulations require and you keep them electronically. FDA's software assurance guidance says documents required under Part 820 that are kept electronically generally count as Part 11 records.[8][9]
Read more
Part 11 applies to records kept in electronic form under FDA record requirements, not to paper records simply sent electronically.[9] For equipment, think cycle logs used as batch records, electronic calibration records, and test results stored only on the instrument PC.
How long do we keep equipment records?
At least the lifetime of the devices the equipment was used for, as you define it, and never less than two years from release, unless a regulation requires longer. The EU MDR, for example, requires technical documentation to be kept for at least 10 years after the last device is placed on the market (15 for implantables), so plan for equipment records that support it to last at least as long.[3][4]
Read more
The clock runs from the last product the equipment touched, not from the date you retire it. Equipment used for years on a long-lived product can carry a long retention period.
References
- 21 CFR Part 820, Quality Management System Regulation (QMSR), §§ 820.7 (incorporation by reference of ISO 13485:2016) and 820.10, effective 2 February 2026. www.ecfr.gov/current/title-21/chapter-I/subchapter-H/part-820
- U.S. FDA, Quality Management System Regulation: Frequently Asked Questions. www.fda.gov/medical-devices/quality-management-system-regulation-qmsr/quality-management-system-regulation-frequently-asked-questions
- ISO 13485:2016, Medical devices — Quality management systems — Requirements for regulatory purposes (last reviewed and confirmed 2025), clauses 4.1.2, 4.1.6, 4.2.5, 6.3, 6.4, 7.4.1, 7.5.1, 7.5.6, 7.6 and 8.2.6. www.iso.org/standard/59752.html
- Regulation (EU) 2017/745 (EU MDR), Article 10(8) and Annex IX, Chapter I, Section 2.2(e). eur-lex.europa.eu/eli/reg/2017/745/oj
- Regulation (EU) 2017/746 (EU IVDR), Annex IX, Chapter I, Section 2.2(e). eur-lex.europa.eu/eli/reg/2017/746/oj
- GHTF/SG3/N99-10:2004 (Edition 2), Quality Management Systems — Process Validation Guidance, January 2004, hosted by IMDRF. www.imdrf.org/sites/default/files/docs/ghtf/final/sg3/technical-docs/ghtf-sg3-n99-10-2004-qms-process-guidance-04010.doc
- ISO 11607-2:2019, Packaging for terminally sterilized medical devices — Part 2: Validation requirements for forming, sealing and assembly processes, with Amendment 1:2023 (last reviewed and confirmed 2024). www.iso.org/standard/70800.html
- U.S. FDA, Computer Software Assurance for Production and Quality Management System Software, final guidance, 3 February 2026 (supersedes the September 2025 version and Section 6 of General Principles of Software Validation). www.fda.gov/regulatory-information/search-fda-guidance-documents/computer-software-assurance-production-and-quality-management-system-software
- 21 CFR Part 11, Electronic Records; Electronic Signatures, § 11.1 (scope). www.ecfr.gov/current/title-21/chapter-I/subchapter-A/part-11
- ISO/TR 80002-2:2017, Medical device software — Part 2: Validation of software for medical device quality systems. committee.iso.org/standard/60044.html
- ISO/IEC 17025:2017, General requirements for the competence of testing and calibration laboratories (last reviewed and confirmed 2023), including clauses 6.5 (metrological traceability), 7.1.3 and 7.8.6 (decision rules and statements of conformity). committee.iso.org/standard/66912.html
- ILAC P10:07/2020, ILAC Policy on Metrological Traceability of Measurement Results. ilac.org/publications-and-resources/ilac-policy-series/
- IAF, Global Accreditation Cooperation Incorporated launch unifies international accreditation organisations and strengthens worldwide trust, 1 January 2026. iaf.nu/en/news/global-accreditation-cooperation-incorporated-launch-unifies-international-accreditation-organisations-and-strengthens-worldwide-trust/. See also Global ACI, Specifying the Use of Global Accreditation Cooperation Incorporated Accreditation, Version 1, 14 April 2026. nata.com.au/files/2026/04/Communication-to-Regulators-about-Global-Accreditation-Cooperation-Incorporated-V1.0.pdf
- ILAC G8:09/2019, Guidelines on Decision Rules and Statements of Conformity, now reissued by Global ACI as Global ACI-TECH-1-002 (see [15]). ilac.org/publications-and-resources/ilac-guidance-series/
- UKAS, UKAS publications update, June 2026 (lists Global ACI technical documents that replace ILAC documents, including Global ACI-TECH-1-002, and cites Global ACI Resolutions 2025-25 and 2025-29 on the continued validity of specified IAF and ILAC documents). www.ukas.com/wp-content/uploads/2026/07/2026.06-Publications-update.pdf
- OIML D 10 / ILAC-G24:2022, Guidelines for the determination of recalibration intervals of measuring equipment. www.oiml.org/en/files/pdf_d/d010-e22.pdf
- NIST, NIST Policy on Metrological Traceability, updated 17 June 2024. www.nist.gov/calibrations/traceability
Regulations and guidance were checked against primary sources at the time of writing. ISO clause content is paraphrased; read the standards for exact wording. Control levels, intervals, the IQ/OQ/PQ examples and the worked example illustrate common practice; they are not requirements. Ardent Point Medical is fictional.